Action Duration

![Action Duration Graph][/docs/WHMCS/wbTeamPro/v3/assets/images/action-duration-graph.png]

The Action Duration graph is a small layered Pie chart that represents three different metrics for the given action.

  • Schedule Target The gray outer ring indicates the position of the current date within the Start and Due Date range for the action, ranging from 0-100%.
  • Duration Target The center pie graph indicates the position of the current summary of Time Elapsed against the target Duration for the action, ranging from 0-100%.
  • Schedule Status The color and label (mouse rollover) of the pie graph indicates the ratio between the Schedule Target and Duration Target for the action. The Schedule status can be Ahead of Schedule (light blue), On Schedule (green), or Behind Schedule (red).